Sec. 2166.155. ESTIMATE OF PROJECT COSTS IN LIEU OF PROJECT ANALYSIS    


Latest version.
  • (a) If the commission determines that the cost of a project analysis is not justified or required, the commission shall, in cooperation with the using agency, develop a realistic estimate of the project's cost.

    (b) If necessary, the commission shall arrange for an on-site inspection and analysis of the proposed project by a commission staff member.

    (c) The commission shall inform a using agency of a cost estimate developed under this section.

Added by Acts 1995, 74th Leg., ch. 41, Sec. 1, eff. Sept. 1, 1995.