Texas Statutes (Last Updated: January 4, 2014) |
GOVERNMENT CODE |
Title 10. GENERAL GOVERNMENT |
Subtitle F. STATE AND LOCAL CONTRACTS AND FUND MANAGEMENT |
Chapter 2267. CONTRACTING AND DELIVERY PROCEDURES FOR CONSTRUCTION PROJECTS |
Subchapter I. JOB ORDER CONTRACTS METHOD |
Sec. 2267.402. APPLICABILITY OF SUBCHAPTER TO BUILDINGS; EXCEPTIONS
Latest version.
-
This subchapter applies only to a facility that is a building, the design and construction of which is governed by accepted building codes, or a structure or land, whether improved or unimproved, that is associated with a building. This subchapter does not apply to:
(1) a highway, road, street, bridge, utility, water supply project, water plant, wastewater plant, water and wastewater distribution or conveyance facility, wharf, dock, airport runway or taxiway, drainage project, or related type of project associated with civil engineering construction; or
(2) a building or structure that is incidental to a project that is primarily a civil engineering construction project.
Added by Acts 2011, 82nd Leg., R.S., Ch. 1129 , Sec. 2.08, eff. September 1, 2011.