Sec. 363.003. DUTY TO REPAIR; FORFEIT OF TOLLS  


Latest version.
  • (a) The contractor shall maintain the bridge during the term of the contract.

    (b) A contractor who fails to maintain the bridge forfeits all right to the tolls.

Acts 1995, 74th Leg., ch. 165, Sec. 1, eff. Sept. 1, 1995.